City of Conyers, GA
Home MenuStormwater Projects
The City of Conyers Stormwater Services division is always busy with major in-house stormwater improvement projects.
Below are some photos of completed projects in calendar year 2022.
Replaced corrugated metal pipe with HDPE / Drop inlet repair – North Main Street/Rockbridge Rd. (before and after)
Replacing corrugated metal pipe with HDPE – West Circle
Sinkhole Repair / yard weir installed - West Circle
Repair drop inlets that were holding water – Irwin Bridge Road/Railroad Street
Yard weir installed on Lakeview Drive to relieve flooding
Replaced 7 grates on Main Street with new grates and hoods for improved drainage
Re-ditching in public right of way to improve drainage – various locations around City
Catch basins and stormwater structures throughout the City